Sunday, February 5, 2017

Northern Work

The shop continues to work inside the Northern (aka 1500).

Here's some of the intricate inlay work in the dinning area that has been cleaned up and revarnished. This is the level of beauty that can be coaxed out of the remainder of the car. Keep this in mind



Bruce and Gary have been at work removing the cracked and splintering outer wall layer in the kitchen. This will be covered with nice, new 1/8 inch material. The hole cut into the wall by the previous owner will also be covered up. Eventually, the partition between the bathroom and kitchen will be recreated.


The orbital sander made quick work of stubborn green paint.


Terrible green and white paint has been removed from the majority of the kitchen/bath. Ceiling sections display cracks and will have to be replaced. The room's doors have been removed to give a bit more space to work in. While they're down, their brass hinges and knobs will be polished.