Kelly, Brian, and Wil greased the motor gears for the majority of operating fleet.
The crew also made great progress on 18. Larry and Fred painted the west end cow catcher and window frames black. Galen prepared the locomotive for the installation of the new brake pipes and worked to patch the hole in the roof. Rex and Jordan vacuumed out the interior of the locomotive, clearing years of debris from the floor and ensuring there were no fire hazards inside the electrical boxes and controllers.
Freshly painted window frames on 18
18's west end is looking better
John has removed one of the steps from the side of 3001 where the treadle door will be eliminated. Kelly got back to work on cleaning up the east end controller. Fred also got in a bit of work removing paint from 169's east end platform ceiling.
No comments:
Post a Comment