Sunday, October 4, 2020

Moving the Fleet

After a week in the shop for some quick touch ups, Connecticut Company 65 has been returned to the Operations Department for service!

65 departing North Road for a test run


In preparation to move 5645 into the shop for repairs, John and the shop needed to manufacture a new oil block for diesel 1. The old block required special hoses to be ordered if one ever failed. John manufactured the new block to be compatible with any standardized oil hose.

The new oil block (on the right with the hose attached)

169 was also moved up into Northern Barn while the fleet was being shuffled around. This was the first time 169 has seen daylight in over 40 years.


169 waiting to be moved into Northern Barn

5645 was moved into the shop after 169 was moved to complete bearing repairs as well as an annual inspection.

A new air tank has been restored to be put under car 16 within the next year. 

16's new air tank

We'd all like to send out a special thank you to Dennis. Dennis has been extremely helpful during our transition in the shop and has been with us to lend a helping hand. Thanks!